- Retro fit Fire Services to an existing building.
- Factory Mutual (FM) ‘intent’ design and construction (D&C) of fire suppression and detection systems to meeting Authority having Jurisdiction (AHJ), the production of Fire Engineered Solution to all relevant codes
- Five Automatic Fire Sprinkler Control valve sets
- Seven Automatic Fire Sprinkler Deluge Control valve sets
- Fire Sprinkler system installed to FM Data sheets for the protection of EPS structure and high piled storage freezer areas with ESFR dry fire sprinklers delivering over 6800l/m.
- Three 60 000 litre storage tanks
- Two Diesel booster pumps installed to AS2118 & AS2941.
- Automatic Fire Detection and Alarm System Installed to AS1670.1 & AS4428.1.