161 O’Connell Street Kingswood
Date Completed: September 2019
Description of works:
- The existing gaseous suppression system is an Argonite – IG-55 utilising a mixture of Argon and Nitrogen gas in a 50:50 mixture ratio.
- The central cylinder bank system serves 15 zones over 3 levels. Each floor consists of 5 gas zones
- Replacement of 118 x 80L Argonite Bottles
- Replacement of 15 directional valves.
- Conducted 15 x room integrity fan tests.
- Supply of 15 new MASDS detection system to allow as double knock operation for gas suppression operation (including electrical supply)
- Re programming of existing Special Hazards Control and Indicating Equipment (SHCIE) at Stage 6 building.
- Replacement of 148 Relief Dampers.